Restrooms & Activity Centers
Overview
Cedar Forest Products offers a variety of restroom & activity center options to fit any project’s needs. Many standard plans are available to choose from or a custom plan can be designed if needed. CFP also has numerous options when it comes to both the interior and exterior finishes of the building as well as all fixtures. Every CFP restroom and activity center is designed to be ADA compliant, attractive, functional and provide many years of service. Standard features include:
Pre-engineered designs
- Each shelter is pre-engineered to meet or exceed local building requirements
- Stamped and sealed drawings and calculations completed by a structural engineer to meet a project’s state and local building codes
- Restroom facilities meet ADA compliance requirements
Cedar Walls
- Pre-cut, preassembled and construction coded to ensure a perfect fit
- Disassembled and delivered to the construction site
- Made using Northern White Cedar; known for its natural beauty, durability and structural integrity
- Cedar is highly desirable for its resistance to moisture warpage, insects and fungus that can shorten the service life of other wood buildings
- Cedar’s cellular structure also offers a natural thermal efficiency
Exterior Wall Construction
- Nominal 4″ x 8″ double tongue and groove timbers are used for exterior wall construction
- Predrilled starter holes for 10″ coated screws spaced at 30″ intervals speed wall construction
- Timbers are cut to length assuring staggered end joints and end matched for precision assembly
- Timbers can be predrilled for electrical conduit
- Electrical outlets are preplanned to meet the project’s needs and can be specified for any location
Roofing
- #1 grade, kiln dried 2″ x 6″ SYP roof decking
- 2″ x 8″ cedar fascia
- 30-year architectural grade shingle package
Doors, Windows and Skylights
- Items are shipped to job site ready for installation
Packages and Options
Cedar Forest Products offers plumbing and electrical fixture packages for all Restrooms and Activity Centers. These packages provide all the fixtures needed to complete the project. They do not include the wiring or conduit and need to be installed by a local plumbing or electrical contractor. HVAC can be added to buildings using a local HVAC contractor.